Total capacity of the planned photovoltaic systems
Estimated reduction
in CO₂ emissions
(28.675.603 kg/year)
Total number of photovoltaic projects developed to date
Participation in the planning of a solar park with an annual energy production of 9,500 MWh in Castilla-La Mancha, Spain.
Participation in the planning of a solar park with an annual energy production of 3,700 MWh in Saxony, Germany.
Participation in the planning of a solar park with an annual energy production of 2,650 MWh in Teramo, Italy.
A renowned and experienced mill operator needed to reduce energy consumption in their logistics center in Leipheim, Bavaria.
Our integrated planned solution included 7512 photovoltaic solar modules, offered an output of 3,981.00 kWp and avoid more than 2,300 kg/year of CO₂ emissions
Complete consultancy for the implementation of a photovoltaic project for several halls of the Glave Group GmbH in Norden, Germany.
The overall rating of the PV project (excluding storage) shows:
Photovoltaic output: 3,915.60 kWp
Self-consumption amount: 1,121,495 kWh/a
CO₂ emissions avoided: 1,685 t/y
Photovoltaic planning for the roof of several halls in Erlangen, Bavaria.
Photovoltaic generator output: 3,611.57 kWp
Photovoltaic generator energy (AC grid): 3,348,562 kWh/year
CO₂ emissions avoided: 2,008,778 kg/year
Photovoltaic project realized for our partner VSB Vertriebs- und Servicegesellschaft für Baudienste mbH.
Planning a solar park with 1,820.07 kWp on an area of 24,000 m² for the Benedictine monastery Ettal in Garmisch-Partenkirchen, Bavaria.
Photovoltaic generator energy (AC network): 2,266,08 kWh/year
System utilization ratio (PR): 90.90%
Grid feed-in: 1,446,832 kWh/year
CO₂ emissions to avoid: 1,359,347 kg/year
Our partner VSB Vertriebs- und Servicegesellschaft für Baudienste mbH will build the solar park.
Planning and conception of a photovoltaic project for JT Solarbau GmbH in Hamburg.
Photovoltaic generator output: 1,186.22 kWp
Photovoltaic generator area: 5,930.2 m²
Number of photovoltaic modules: 3206
Plant utilization ratio (PR): 91.8%
CO₂ emissions avoided: 507,059 kg/year
Development of a feasibility study and entire photovoltaic planning for UPMANN.
PV generator output: 1,072.48 kWp
PV generator energy (AC network): 954,429 kWh/year
Self-consumption share: 49.6%
Avoided CO₂ emissions: 448,481 kg/year
Planning and conception of a photovoltaic project for JT-Solarbau GmbH and investors in Hamburg.
The total output of the installed PV system is 1,071.00 kWp, with a high specific annual yield of 857.40 kWh/kWp. The plant utilization ratio (PR) is 89.72% and the savings in CO₂ emissions amount to 431,588 kg/year.
Photovoltaic planning for the Lövenich Soccerworld in Cologne.
Photovoltaic generator output: 1,048.13 kWp
System utilization ratio (PR): 88.68%
CO₂ emissions avoided: 446,721 kg/year
Photovoltaic project for our partner JT-Solarbau GmbH.
Photovoltaic planning for the company SOMMER facade systems – steel construction – security technology GmbH & Co. KG, Döhlau, Bavaria.
Photovoltaic generator power: 999.32 kWp
CO₂ emissions avoided: 583,369 kg/year
Degree of self-sufficiency: 32.1%
Photovoltaic project realized for our partner VSB Vertriebs- und Servicegesellschaft für Baudienste mbH.
Photovoltaic planning of a self-consumption system for one of the production facilities of the multinational KaVo Dental GmbH in Warthausen, Baden-Württemberg, Germany.
Photovoltaic generator output: 987.20 kWp
Photovoltaic generator energy (AC grid): 990,173 kWh/year
Own consumption share: 96.9%
CO₂ emissions avoided: 594,025 kg/year.
The system was installed by our partner VSB Vertriebs- und Servicegesellschaft für Baudienste mbH.
Planning a photovoltaic system for the buildings of hapa AG, a company in Herrieden, Bavaria, that produces innovative products in the areas of plastic windows, front doors and roller shutters.
Photovoltaic generator output: 975.65 kWp
Photovoltaic generator energy (AC grid): 1,011,696 kWh/year
CO₂ emissions avoided: 606,907 kg/year
The installation was carried out by VSB Vertriebs- und Servicegesellschaft für Baudienste mbH.
Photovoltaic planning for Steel Automotive GmbH, a company that develops and produces tools and parts for the automotive industry.
Photovoltaic generator output: 814.42 kWp
CO₂ emissions avoided: 511,840 kg/year
Own consumption share: 69.7%
Another project to be installed by our partner VSB Vertriebs- und Servicegesellschaft für Baudienste mbH.
Loll Feinmechanisch GmbH, which has been designing precision mechanical systems and components for 70 years, wanted to improve the energy efficiency of its factory in Tornesch in Schleswig-Holstein.
The planning and conception of the 800 kWp photovoltaic project, exactly distributed across 6 halls (realized together with our partner Hansa Energie Service GmbH & Co. KG), enables independence from the power grid and a reduction in CO₂ emissions by 288.000 kg/year .
Photovoltaic project planning on-roof system and open space system in a commercial area in Aurich in the Wallinghausen district.
Photovoltaic generator output: 707.25 kWp
Generator area: 3,372.4 m²
Number of PV modules: 1725
CO₂ emissions avoided: 318,558 kg/year
Photovoltaic system from our partner JT-Solarbau GmbH.
Photovoltaic project planning for West Campus UG (limited liability) & Co.KG, Herxheim, Rhineland-Palatinate.
Photovoltaic generator output: 574.82 kWp
Specific annual yield: 1,012.82 kWh/kWp
Own consumption share: 63.3%
CO₂ emissions avoided: 273,628 kg/year
Project realized for our partner Energiewatt Solartechnik GmbH.
Development of a feasibility study and entire photovoltaic planning (Hof Peitz).
PV generator output: 478.91 kWp
Grid feed-in: 415,099 kWh/year
CO₂ emissions avoided: 194,919 kg/year
Caralux LED- und Neonlichttechnik GmbH, a large company in Rackwitz that is active in the field of LED manufacturing, was looking for a comprehensive solution to reduce energy consumption.
The proposal for the main building included a photovoltaic system with a capacity of 327.75 kWp as well as inverters and storage from our partner Azzurro - Zucchetti Centro Sistemi. In addition to reducing dependence on the electricity grid (specific annual yield: 955.59 kWh/kWp), the annual CO₂ savings amount to 147,195 kg/year.
Photovoltaic project planning for a developer of the Karlsruhe Sport Club (KSC).
Photovoltaic generator output: 236.55 kWp
Specific annual yield: 1,180.62 kWh/kWp
Photovoltaic generator area: 1,113.1 m²
Number of PV modules: 570
CO₂ emissions avoided: 131,259 kg/year
KSC photovoltaic system on the football stadium in the wildlife park realized by our partner Energiewatt Solartechnik GmbH.
Luckenwalder Wohnungsgesellschaft mbH was supposed to develop an e-charging infrastructure concept in combination with a photovoltaic system and a tenant electricity offer for an existing building complex in Luckenwalde, Brandenburg.
The solution offered includes a 233.53 kWp photovoltaic system, the energy of which can be used both to power tenants and to charge electric cars. In addition, there is a CO₂ emissions avoided of 95,687 kg/year.
Planning and conception of a photovoltaic system for Coswig.
Photovoltaic generator output: 233.47 kWp
Specific annual yield: 954.69 kWh/kWp
Plant utilization ratio (PR): 94.0%
CO₂ emissions avoided: 133,734 kg/year
Photovoltaic system from our partner JT-Solarbau GmbH.
Planning and conception of a photovoltaic project for the parking garage of the Europa Center Berlin, which belongs to a large real estate group based in Hamburg.
The project was developed together with our partner Hansa Energie Service GmbH & Co. KG.
Planning and conception of a photovoltaic project for Handel & Mack GmbH & Co. KG, a company in Weilheim an der Teck that specializes in high-quality roof systems and individual special sheets.
The photovoltaic project was implemented by our partner VSB Vertriebs- und Servicegesellschaft für Baudienste mbH.
The cooperation between greeneps GmbH and its partner Hansa Energie Service GmbH & Co. KG has brought a photovoltaic system designed for tenants online in Greifswald.
The photovoltaic system, which emerged from the planning, project planning, tendering and project management of the photovoltaic project for the Wohnungsbau-Genossenschaft Greifswald eG, achieves excellent annual solar power generation.
On behalf of Immobilien Jugan Investmentverwaltung GmbH, we realized a project for some of their apartments in Munich.
It is a 70 kWp photovoltaic system, a photovoltaic generator output (AC network) of 63,645 kWh/year and which saves CO₂ emissions of 29,911 kg/year.
Another order for Immobilien Jugan Investmentverwaltung GmbH was the planning of a 40 kWp photovoltaic system.
This photovoltaic project enables a specific annual yield of 1,000.28 kWh/kWp and the tenant of the building avoids the emission of 18,805 kg/year of CO₂.
Planning a photovoltaic system for the Landgasthof Langfeldsmühle, Babenhausen-Hergertshausen, Hesse.
Photovoltaic generator output: 26.24 kWp
CO₂ emissions avoided: 10,794 kg/year
Degree of self-sufficiency: 54.7%.
The photovoltaic system was installed by my-GreenFactory Gmbh.
12 kWp Photovoltaic Project
Planning, conceptual design and installation of a photovoltaic system for a company in Bad Oeynhausen, OWL, NRW.
Photovoltaic generator output: 12.92 kWp
Plant utilization rate (PR): 87,61 %
Self-sufficiency: 54.5 %
Installation time: 6 hours
CO₂ Emissions avoided: 5.155 kg/year
A photovoltaic project installed in record time by
xolarc GmbH, specialists in the installation and operation of photovoltaic systems as well as in specialized
solar energy services.
Legal Notice |
Privacy Policy |
Cookies Policy
© 2024 greeneps GmbH